Free Wind Evaluation

Long Beach home wind power installation

Residential Wind Power - Long Beach wind installers

Current California wind energy incentives include generous rebates for wind turbine and wind generator installation.  When combined with Federal wind energy rebates your home wind power installation will be approximately 60% less because of the incentives!  Our wind installers will be happy to answer your questions and explain the benefits of residential wind power.  Simply fill out the form below and a certified wind installer will contact you by phone at your convenience.

California wind power incentives - wind energy rebates and tax credits

California is one of the best states for wind power for two reasons:  its abundant wind energy and its fantastic wind incentives and rebates.  Look here for details on the California energy tax credit, rebates, grants and solar, wind incentives like the California Feed-In Tariff .

Long Beach wind turbine installers - local wind power experts

Home wind power installation by qualified Long Beach turbine installers is important for both safety and long term performance of your wind power installation.  Whether your wind generator will be connected to the grid through net metering, or completely off the grid, employing local Long Beach wind energy installation experts will ensure your satisfaction and provide for quick follow-up and maintenance.  Fill out our wind power installer form and we will have an approved, licensed residential wind turbine installer from Long Beach contact you within hours. 

Long Beach Wind Power Installation - The Process

Step 1.  Fill out the Long Beach wind power installation form to give us basic information on your home or business, the proposed location for the turbine, and your contact information.

Wind Turbine Installation - Information gathering

Step 2.  A Long Beach wind installer will call to ask further questions and arrange a visit.

Step 3.  On-site visit to speak with the home/business owner, assess the location of the wind turbine.  The installer will take wind measurements and answer specific questions about the wind power installation.

Step 4.  Windmill installer will deliver detailed Long Beach installation proposal.  Proposal includes all applicable rebates, from Long Beach, state and federal energy tax credits.  Contracts signed.

Long Beach Wind Generator Installation - Installation work begins

Step 5.  A typical residential wind power installation takes 1-2 days after the wind generator and equipment arrive. Wind turbine installation will usually involve 2-3 Long Beach installers working together to complete the job.  For some insight into the specifics of the installation process and wind turbine components, watch the installation videos on this page.

Ready to take the next step?  Fill out our Long Beach wind turbine installation form.  We'll get right back to you! 

Cheers to you for harnessing the wind! Thank you for keeping our Long Beach, California wind contractors working...

Free Wind Evaluation

877-331-1235 | © Copyright DASolar.com.