Maryland home wind power installation

Residential Wind Power - Maryland wind installers

Current Maryland wind energy incentives include generous rebates for wind turbine and wind generator installation.  When combined with Federal wind energy rebates your home wind power installation will be approximately 60% less because of the incentives!  Our wind installers will be happy to answer your questions and explain the benefits of residential wind power.  Simply fill out the form below and a certified wind installer will contact you by phone at your convenience.

Maryland wind power incentives - wind energy rebates and tax credits

Maryland is one of the best states for wind power for two resaons:  it's abundant wind energy and it's fantastic wind incentives and rebates.  Look here for details on the Maryland energy tax credit, rebates, grants and solar, wind incentives like the Maryland Tax Credit for Clean Energy Production.

Maryland wind turbine installers - local wind power experts

Home wind power installation by qualified Maryland turbine installers is important for both safety and long term performance of your wind power installation.  Whether your wind generator will be connected to the grid through net metering, or completely off the grid, employing local Maryland wind energy installation experts will ensure your satisfaction and provide for quick follow-up and maintenance.  Fill out our Maryland home wind power installer form and we will have an approved, licensed residential wind turbine installer from Maryland contact you within hours. 

Maryland Home Wind Power Installation - The Process

Step 1.  Fill out the Maryland residential wind power installation form to give us basic information on your home, the proposed location for the turbine, and your contact information.

Wind Turbine Installation - Information gathering

Step 2.  A Maryland wind installer will call to ask further questions and arrange a visit to your home.

Step 3.  On-site visit to speak with the homeowner (see video), assess the location of the wind turbine.  Take wind measurements and answer specific questions about the wind power installation.

Step 4.  Wind installer will deliver detailed Maryland installation proposal.  Proposal includes all applicable rebates, from Maryland, state and federal energy tax credits.  Contracts signed.

Maryland Wind Generator Installation - Installation work begins

Step 5.  A typical residential wind power installation takes 1-2 days after the wind generator and equipment arrive. Home wind turbine installation will usually involve 2-3 Maryland installers working together to complete the job.  For some insight into the specifics of the installation process and wind turbine components, please visit our DIY Solar Network to view a series of wind turbine installation videos.

Ready to take the next step?  Fill out our Maryland wind turbine installation form.  We'll get right back to you! 

Cheers to you for harnessing the wind! Thank you for keeping our Maryland wind contractors working...  

Find an installer:

Maryland

   - Annapolis
   - Anne Arundel County
   - Aspen Hill
   - Assateague
   - Baltimore
   - Bethesda
   - Bowie
   - Calvert County
   - Carroll County
   - Charles County
   - Columbia
   - Cumberland
   - Dundalk
   - Eastern Shore
   - Edgewood
   - Essex
   - Frederick
   - Gaithersburg
   - Germantown
   - Glenmont
   - Hagerstown
   - Howard County
   - Maryland Shore
   - Montgomery County
   - Ocean City
   - Queen Annes County
   - Reisterstown
   - Salisbury
   - Silver Spring
   - Talbot County
   - Towson
   - Wheaton

Other States

Talk with a solar pro
free-solar-evaluation
talk-with-an-energy-auditor

Proud Member of:
Solar Energy Industries Association

American Solar Energy Society

American Council on Renewable Energy

American Wind Energy Association


Maryland Wind Installers
Maryland Wind Installers
PBS Special - small wind turbines
Small wind turbine installation
Wind Power detailed history